Site development depends on more than digging capacity. Excavated material must reach a truck, stockpile, or fill area at the right time. If one stage falls behind, the rest of the fleet can spend more time waiting than working.
Longmai offers a starting point for coordinated equipment sourcing. Hefei Longmai Construction Machinery Trading Co., Ltd. supplies used excavators, loaders, dump trucks, and other construction machinery for international buyers.
Contractors and project procurement teams can request equipment options, inspection information, agreed preparation, and export support around one project brief.
Solve the Gaps Between Excavation, Loading, and Hauling
Buying machines separately can leave practical gaps. An excavator may reach the required depth, while the selected truck is difficult to position. A loader may handle the material, while its dump clearance does not suit the receiving body.
The proposed supply approach connects three decisions:
- What work must each machine perform?
- Can the machines work together within the site layout?
- What condition and delivery requirements must each unit meet?
This creates a clearer equipment specification before purchasing begins.
Configure the Equipment Around the Material Flow
The following arrangements provide a planning framework. They are not fixed fleet ratios or confirmed production packages.
| Project workflow | Equipment arrangement to assess | Key coordination requirement |
| Direct excavation and removal | Excavator with dump trucks | Loading reach, truck access, and haul cycle |
| Excavation with temporary storage | Excavator, stockpile loader, and trucks | Storage space and rehandling workload |
| Imported fill distribution | Dump trucks with a wheel loader | Delivery rate, unloading area, and material movement |
The final fleet depends on material, ground conditions, daily targets, available space, and existing equipment. Additional grading or compaction equipment should be specified where the work requires it.
Excavation Module: Open the Work Area and Feed Hauling
Longmai’s used CAT 320D2 excavator is one listed option for earthmoving and truck loading. Its reference configuration includes an operating weight of approximately 21,200–21,400 kg and a 1.0 m³ bucket.
For a project proposal, confirm the required digging profile, working reach, material, and loading position. Then verify the offered unit’s boom, arm, bucket, track configuration, and actual condition.
Where the excavator loads trucks directly, assess truck exchange space and discharge clearance together. This helps define whether the loading arrangement fits the work area.
Loading Module: Manage Stockpiles and Material Transfer
The used XCMG ZL50GN wheel loader provides another reference option. Longmai lists a 5,000 kg rated load and an approximately 3.0 m³ bucket for this model.
A loader can serve stockpile loading, short material transfers, and fill handling where site conditions suit the machine.
Include material density, pile layout, travel distance, and receiving height in the brief. Bucket volume and rated load must be considered together; a full bucket does not establish an approved payload for every material.
Hauling Module: Connect the Loading Point With the Destination
Longmai lists a used HOWO 371HP 6x4 dump truck for construction and bulk material transport.
Truck selection should follow the actual route. Confirm gradients, road condition, turning space, loading access, and unloading arrangements.
Also establish the permitted payload for the specific vehicle and destination. Cargo-body volume and horsepower alone do not determine how many tonnes may be carried.
Each truck should be assessed individually, including its drivetrain, brakes, chassis, tires, cargo body, and tipping system.
Match Capacity Across the Fleet
The equipment list becomes useful when the loading and hauling assumptions are connected.
Estimate bucket payload using the selected attachment, material density, and realistic fill conditions. Next, assess loading passes, truck capacity, and the full hauling cycle, including waiting and truck exchange.
Check physical compatibility as well as capacity. Dump height, reach, body height, and positioning space all affect the arrangement.
Record these assumptions in the proposal. Use representative site observations where available, then review the plan when routes, material, or production targets change. No single excavator-to-truck ratio suits every project.
Define Machine Preparation Before Dispatch
A coordinated order still requires separate acceptance records for each unit.
| Supply item | Scope to agree |
| Machine identification | Serial number, configuration, included attachments, and current photographs |
| Condition assessment | Inspection coverage, operating evidence, defects, and disclosed wear |
| Preparation work | Approved repairs, servicing, parts, and completion records |
| Final acceptance | Reinspection findings and agreed release conditions |
Longmai’s dump truck fleet preparation solution describes a related approach to inspection and export preparation.
Confirm whether independent inspection can be arranged. Keep cosmetic work separate from mechanical acceptance so both parties understand the delivery standard.
Coordinate Export, Arrival, and Service Support
Longmai describes support for inspections, customs documentation, international shipping, spare parts, and remote maintenance guidance. Confirm the services included in the commercial offer. Longmai
For a mixed fleet, plan arrival around the work sequence. Agree whether equipment will ship together or in stages, subject to unit readiness and transport availability.
The delivery scope should identify packing, removed components, included accessories, shipping documents, and reassembly responsibilities. Destination import eligibility should be confirmed before shipment.
For service planning, request parts lists using actual component details. Identify the buyer’s local maintenance resources and clarify the available remote support, response arrangements, and any warranty terms.
Request a Project Equipment Proposal
Send Longmai the following information:
- Project location and destination port
- Material type and estimated volume
- Daily production target and shift pattern
- Digging requirements and site layout
- Haul distance, road conditions, and unloading points
- Existing equipment and additional units needed
- Budget, condition requirements, and delivery schedule
Request an itemized proposal covering machine options, quantities, inspection, preparation, attachments, parts, and transport. This gives procurement teams a defined scope to review.
Frequently Asked Questions
Must the solution include all three machine types?
No. The arrangement should fill the gaps in your operation. Direct excavator loading may reduce the need for a separate stockpile loader.
Can different brands work in one fleet?
Yes, subject to verified working compatibility, capacity, site suitability, and service arrangements. Matching brands alone does not establish a balanced fleet.
Is project output guaranteed by the equipment list?
No. Output depends on machine condition, material, operators, routes, maintenance, and site organization. Any production estimate needs stated assumptions and project-specific review.